Monthly Reports:
|
|
Project News:
|
|
Project Photos: click on thumbnail to enlarge ![]() New Photos (December 2006) ![]() |
|
Project Description:
Construction was completed in 2008, of this 20,563 square foot addition which now supplements the existing theater facility with a new drama studio, rehearsal studio, expanded green room and scene shop. The addition showcases make-up labs and dressing rooms for men and women, a costume construction lab, a lighting shop, and a computerized design studio. In addition, four large labs with smaller break-out spaces provide for the facilitated instruction of Speech courses. Unique features to the Speech/Drama Addition include labs equipped with the latest in smart classroom technologies which are acoustically designed so several speech courses can be taught simultaneously without disturbing neighboring classes. A new fire access way has been constructed at the west and north sides of the existing Performing Arts Center building to provide adequate emergency access for fire vehicles, and a new lakefront pedestrian walkway allows for easier access between this new facility and the rest of the campus. The construction of the Speech/Drama Addition project is State funded at $7,904,000 and required an additional $5,000,000 to be funded by the District. |