Standard
Eight:
Physical
Resources
The
institution has sufficient and appropriate physical resources to
support its purposes and goals.
8.1 The
institution ensures that adequate physical resources
are provided to support its educational programs
and services wherever and however they are offered.
Descriptive
Summary
Victor
Valley Community College District, encompassing over 2200 square
miles of the High Desert of Southern California, serves this vast
area through the facilities on its 300 acre campus in the city of
Victorville. Situated adjacent to the historic Mojave River, the
site consists of forty buildings and major district owned and controlled
infrastructure including: roads, computerized phone system service,
high voltage electrical service, primary water service, campus owned
and operated water wells, and medium service natural gas distribution.
The campus is especially noteworthy for its dramatic layout around
a centrally located five-acre lake. A part of the historical and
cultural development of the east Mojave Basin, senior members of
the area recall stock watering at the site during early ranching
days. Today, students, faculty, staff and the public frequently
can be seen enjoying this beautiful setting.
The
District has completed major improvements in access issues over
the past five years. Beginning with the creation of a Transition
Plan,1 which was completed in 1992, goals were identified
to overcome such barriers as the 70 foot elevation change between
upper and lower campus and the absence of power assisted doors on
major buildings. Both of these examples have been addressed. A major
project has been completed providing an elevator connecting upper
and lower campus. This building has a capacity for three elevator
cars. Also, another remodel project has provided for the retrofitting
of building doors and restrooms to accommodate disabled persons.
During
the past five years the District has constructed with state facilities
funds:
- a Science
laboratory building with (5) life science labs, (5) physical science
labs, (24) faculty offices, and a planetarium
- a Learning
Resource Center
- a Central
Plant project
- a Construction
Technology building
- a Gymnasium
The
District constructed a Student Activities Center through local funding.
The
earlier Library building has been remodeled into an Academic Commons
which includes a Learning Center, a language lab, a student assessment
center and a learning disabilities /ACT center--all employing computer
technology.
The
earlier Science building has been modified to accommodate general
purpose classrooms and a dean/faculty office complex.
The
District has a fiber optic ATM backbone which connects classrooms,
offices, and services to the district network, 4C/Net, and the Internet.
Some 600 student computer stations are used by disciplines ranging
from a CAD/graphics lab, digital photography, and word processing,
to allied health lab. All faculty offices are equipped with computer
technology. The District is in the process of beginning to install
level one smart classroom technology.
This
fall a 5,280 square foot modular unit child development center is
being constructed using a combination of state funds, CalWORKS funds,
and Block Grant funds (City of Victorville). It will more than double
the district’s child development service.
Also
this fall tennis courts (6) are being constructed using private
contributions (matching basis). This will enable the physical education
and athletic programs to offer classes and compete on quality courts.
This spring, a softball complex will be constructed using private
funds (matching basis). As with tennis, the District will finally
have a quality softball field for classes and competition.
The
District has also been in the process of replacing classroom and
office furniture to ensure sound ergonomics and access.
Some
1,000 additional parking spaces have been added to the campus for
student, faculty, and staff convenience over the past five years.
Some 20 percent of classrooms and parking lots are refurbished each
year to ensure that campus physical facilities are maintained at
a quality level.
Self
Evaluation
The
institution has sufficient and appropriate physical resources to
support its purposes and goals. Even with the recent, unprecedented
growth, the District has identified additional needs created by
the even faster growth of technology and its related features, such
as lap top personal computers and access to the World Wide Web.
The District has submitted a new building proposal. This project
will be an Advanced Technology Center. The building will support
computer assisted learning with:
- 260 student
computers - open lab
- 5 dedicated
computer labs
- 15 classrooms
wired for lap top PCS
- 30 faculty
offices
An
engineering study was commissioned during 1997/98 to determine data
and audio-visual transmission infrastructure needs of the campus
to bring these to every classroom, office, and service center.
The
District has studied traffic safety both entering and exiting the
campus as well as on campus. It was found that both the Jacaranda
and Fish Hatchery Road entrances present safety concerns.
A
Department of State Architect study found the "old" Gymnasium
to be seismically unsafe. An engineering study will be performed
this year for corrective analysis and retrofit estimated cost.
The
campus is energy efficient. This includes:
- a Central
Plant which uses 54 degree well water to cool buildings. This
water flows into the lake where it is pumped to irrigate the campus.
- a computerized
energy management system.
- an energy
project was completed which replaced older light ballasts, air
conditioning/heating motors, etc. with energy efficient ones.
The
District is planning to incorporate an elevator at the site of the
proposed new Advanced Technology Center. This will address a second
location on campus where the topography shows elevation changes
too severe to comply with Average Daily Attendance and other code
requirements.
The
District has submitted Initial Planning Projects (IPPs) and Final
Planning Projects (FPPs) for state funding for:
- Advanced
Technology Complex
- Road Safety
Project
- Telecommunications
Infrastructure Project
- Child Development
Center
- Theatre Arts/Speech
facility
Facility
planning is ongoing. Facility needs under consideration include:
- secondary
effects of the Advanced Technology Complex
- retrofitting
of the "old" Gym and determining its future use
- soccer fields
- a teaching
lab for the Restaurant Management program
- an adaptive
physical education facility
- refurbishing
of the Performing Arts Center
- assorted
Scheduled Maintenance projects
- bringing
the Print Shop back to the campus so that it is accessible and
networkable
Planning
Agenda
None.
8.2
The management, maintenance, and operation of physical facilities
ensure effective utilization and continuing quality necessary to
support the programs and services of the institution.
Descriptive
Summary
The
management, maintenance and operation of the district’s infrastructure
ensures effective use and continuing quality necessary to support
the programs and services of the College. The District Facility
Master Plan2 pledges to preserve this unique feature
for posterity, displaying an understanding of the critical connection
between successful learning and a positive, reinforcing learning
environment. This understanding is further demonstrated throughout
this beautiful campus. The continuing growth in student enrollment
has recently been matched by the most significant increase in new
building construction since the College’s inception over thirty
years ago, ensuring additional support for educational programs.
Self
Evaluation
The
management, maintenance and operations of the physical facilities
ensure effective use and continuing quality necessary to support
programs and services of the institution. The maintenance and operations
uses a system of priority ranking work order requests. This system
places all requests to keep the teaching and study environment working
second only to safety issues. Critical operations such as building
heating and cooling are noted in the maintenance "comfort log"
immediately as they are called in. These needs are then relayed
via portable radio directly to the M & O personnel in the field
who then respond. The District recently completed an update of its
Energy Management System. Based on computer monitoring of all critical
building functions, this installation represent a state-of-the-art
method for ensuring a good learning environment.
Planning
Agenda
1. The
District will continue the quality of its Maintenance, Custodial
and Grounds operations. Gauging this will be accomplished through
customer satisfaction surveys.
8.3
Physical facilities at all site locations where courses, programs,
and services are offered are constructed and maintained in accordance
with the institution’s obligation to ensure access, safety, security,
and a healthy environment.
Descriptive
Summary
The
past three years have seen the completion and occupancy of a new
Main Gymnasium, Science Lab Building, Learning Resource Center (Library),
Central Plant and Student Activities Center, all which were part
of the Five-Year Capital Outlay Construction Plan.3
These represent an increase of 91,288 allotted square feet. Additional
physical plant resources completed during the past three years include:
- Construction
Technology building
- Access project,
including an elevator
- Remodel of
library into an Academic Commons, which houses a Learning Center,
LD/ACT, language lab, and student assessment
- Remodel of
old Science building
Self
Evaluation
Physical
facilities are constructed and maintained to insure access, safety,
security and a positive learning environment. The previous self-study
addressed the need for maintaining budget support for the Maintenance
and Operations Department areas. The Maintenance and Operations
department has budget support for personnel, equipment, tools, vehicles,
supply resources to maintain the campus at a quality level. The
department is encouraged to seek better ways to get their work done
through staff development activities, consultants, and equipment.
The department is currently funded for (9) maintenance, (6) grounds,
and (13) custodial personnel, as well as a director and a support
position.
The
Standard Eight self-study committee sought the input of the entire
campus community through the Standard 8 Campus Survey Questionnaire-1998.4
This survey included questions about vehicle and pedestrian safety
on campus, safety of existing lighting, disabled facilities, and
parking spaces. In summary, most notable was the absence of any
single topic of concern to which the majority of respondents called
attention.
The
District has been successful in yearly applications for funds for
the District Scheduled Maintenance Program-1997-985 receiving,
on average, more than $300,000 in state support. Projects already
identified and typical of these ongoing efforts include: refurbishment
of high voltage electrical equipment, replacement of underground
phone lines, roof replacements, refurbishment of mechanical air
handlers for better building environments and reduced maintenance
costs. Continuation of this successful activity is recommended.
The
Director of Maintenance and Operations and members of his staff
directly participate in Master Planning activities and budgeting.
This has occurred during past years and will continue in the future
to support the annual Maintenance and Operations Goals and Objectives
1997-98.6
Planning
Agenda
1. The
budget will continue to keep pace with the general growth of the
campus and its students.
8.4
Selection, maintenance, inventory and replacement of equipment are
conducted systematically to support the educational programs and
services of the institution.
Descriptive
Summary
Selection,
maintenance, inventory and replacement of equipment are conducted
through a coordinated process involving faculty, staff and administration
to support the District Educational Master Plan Chapter 8.7
All equipment is coordinated and purchased through the Purchasing
Department. Needed equipment is identified at the line level by
those who work with the equipment. Their suggestions and requests
are forwarded through meetings with their supervisor, who in turn
completes formal budget request documents. These requests eventually
are further priority ranked by the Administration and approved items
are listed in the final budget. The current budget planning process
provides for equipment needs.
Selection
is a coordinated process typically originating in the user department.
Related infrastructure needs are coordinated through maintenance
and operations. Maintenance of equipment is primarily the responsibility
of maintenance and operations including such evaluations as repair
versus replacement.
Inventory
is the responsibility of maintenance and operations. Computerized
records are kept of all capital equipment. Computer equipment and
software is handled separately by Management Information Systems
and forwarded to the Maintenance and Operations Department who conducts
an annual random audit of physical inventory to confirm location
and condition.
Request
for replacement of equipment again typically originates in the user
department and follows the same purchasing procedures of selection
through Maintenance and Operations Department. Equipment acquisition
and accountability procedures are processed through the Management
Information Systems Department. Instructional equipment, including
state Instructional Equipment funds, Block Grant funds, building
equipment funds, a local funds exceeded $5 million over the past
three years. There are currently more than 600 student computer
stations in place, as well as 586 Pentium PCs for every faculty
member and service, all of which are connected to the district network,
4C/Net, and Internet.
Student
classroom furniture has been upgraded to ergonomic student computer
stations and chairs. Every classroom and lab is disabled accessible.
Employee work equipment has also been upgraded during the past three
years to ensure work effectiveness and efficiency.
Self
Evaluation
The
District process provides for all members of staff to review their
needs at their department level. These recommendations are forward
by supervision to the management level for final review and selection
by the Administration. Through this method funds, such as those
provided as part of capital outlay, are allocated.
Recent
new building construction has been supported by more than $1,500,000
in network size computers and similar amounts for new furniture
and related program equipment has also been budgeted. The new Construction
Technology Building has been facilitated with the newest equipment
used by the traditional trades. The value of these instructional
center machines exceeds $500,000 dollars. There has been a concern
in the timeliness of deliveries of equipment; however, the recent
adding of a staff member in the purchasing staff will improve the
purchasing process.
Planning
Agenda
1. The
College will continue the existing process of recommending equipment
needs. Involvement of the first level users in this activity is
an excellent approach and will be continued.
8.5
Physical resource planning and evaluation support institutional
goals and are linked to other institutional planning and evaluation
efforts, including district or system planning and utilization where
appropriate.
Descriptive
Summary
Physical
resource planning involves all levels of the institution to ensure
coordination between infrastructure and the Educational Master Plan.
The
participants in the District Facility Master Plan Task Force include:
- Faculty
- Staff
- Management
- Administration
- Student representatives
In
addition, the Task Force includes a District architect, a facilities
consultant, and a telecommunications consultant. The District Five-Year
Plan is updated annually with Initial Planning Project (IPP) and
Final Planning Project (FPP) submitted for funding on a timely basis.
Meetings are held periodically throughout the year for review. Opportunity
is provided for constituents to brief their representative groups
and return with suggestion and other responses. In addition, a survey
such as the Custodial Services Survey-19978 is an example
of input from constituents and their representative groups which
clarifies customer needs and satisfactions.
Self
Evaluation
Physical
resource planning and evaluation support institutional goals and
are coordinated with the Educational Master Plan. Among areas previously
addressed were campus lighting, parking and telecommunications.
A Campus Lighting Survey9 that was conducted two years
ago revealed that areas of campus, such as parking lot number five,
were perceived to be inadequately lighted as a result of too few
fixtures. This is also true of undeveloped areas around the athletic
fields on lower campus.
Problems
with parking are listed on student and faculty surveys. It is often
stated that parking is too distant from classrooms. Comparison with
parking ratios to the majority of other community college campuses
shows that Victor Valley College parking is a favorable ratio of
two thousand parking spaces for the approximately 10,000 students,
or a ratio of 5-to-1. This is a much better ratio than many other
colleges. At no time have all of the parking spaces been used close
to 100 percent.
Also,
an evaluation of the average walking distance from parking to buildings
revealed that most classes can be reached with less than a fifteen
minute walk. Two new parking lots have yet to see full use during
the two years since they were built.
Telecommunications
service, particularly the campus phone system, has not kept pace
with general campus growth. This is particularly true in light of
the most recent addition of the three major campus buildings. Repairs
and improvements have been scheduled for this summer.
A
final item of the Standard 8 questionnaire referred to by respondents
is the occasional interruption of buildings’ air conditioning. Until
recently, all buildings were cooled by their own small "package"
air conditioning system. Along with the completion of the newer
major buildings, the District successfully built a new central plant
building which contains 500 tons of chilling capacity and equivalent
heating capacity which is distributed to the new buildings via underground
piping systems.
The
District has upgraded lighting in Lot 5. This was done fairly cost
effectively using in-house personnel. The results were a dramatic
improvement. Further similar improvements for the athletic areas
are recommended.
The
District is currently improving the telecommunications system. It
recently completed the installation of a fiber optic backbone throughout
the entire campus. The fiber optic backbone is fully functioning.
By the end of the fall semester, all faculty, classrooms, and services
will access the network. Fiber optic (data) wiring is one of these.
The
new Central Plant System also incorporates a unique well-water pre-cooling
system. The well water is also used as a source of water for campus
irrigation. This highly unique and very efficient system was awarded
an $84,000 rebate by the Southern California Edison Company for
its outstanding improvement in energy usage. Expansion of the coverage
of this plant to existing buildings and landscaping is planned.
Planning
Agenda
1. The
College will focus on a coordinated effort clearly linking the Facility
and Educational Master Plans. The existing format that provides
for an input from all areas of the campus community will be continued.
The likely development of the new Advanced Technology Center will
provide an ideal platform for this continuing involvement.
Standard
Eight Documents Cited:
1. Transition
Plan
2. District
Facility Master Plan
3. Five
Year Capital Outlay Construction Plan
4. Standard
8 Campus Survey Questionnaire, 1998
5. District
Scheduled Maintenance Program, 1997-98
6. Maintenance
& Operations Goals and Objectives, 1997-98
7. District
Educational Master Plan
8. Custodial
Services Survey, 1997
9. Campus
Lighting Survey
Standard
Eight Committee Members:
John
Beale - Maintenance
Diane
Chapman - Financial Aid
Patricia
Gummo - Physical Sciences Support
Dr.
Robert Kirkham - Instruction - Physics
Ken
Larson - Instruction - Construction Technology
Jack
McGowan - Maintenance - Locksmith
Sharon
Walker - Facilities Construction
Nancy
Wilkett - Custodial
|